Proactive and Compliant Solutions

Email Support

info@humberbankinstruments.co.uk

Call Support

01472 476033

Humber Bank Instruments · Grimsby workshop

Workshop

Build and prove the package off site before plant access is needed.

What comes through the workshop

  • Off-site calibration with agreed acceptance criteria and records
  • Control, solenoid and instrumentation panels: assembly, wiring, inspection and FAT
  • Courtyard integration space for EC&I fit-out on 20-foot container packages
EC&I design

D7300 column replacement

See how column access, containment, cabling and lighting moved from the design model to the installation.

More from HBI