Five short project films: watch the work move from drawing and model to site.
The drawing, assembled panel and installed pipework interfaces.
Compare the column model with the installed structure and services.
See the installation details and the relationship between routes and access.
Follow the progression from the model to vessel dressing and the standing column.
A short montage of the engineering model, cable containment, routing and access. Contains music.
Engineering, workshop and field services · Grimsby and the Humber.