Proactive and Compliant Solutions

Email Support

info@humberbankinstruments.co.uk

Call Support

01472 476033

Humber Bank Instruments · Case study · panel build

Solenoid panel: from drawing to site

Follow the solenoid panel from drawing to installed interface.

What the drawing had to communicate

Where the solenoids, wiring and pipework meet, the arrangement has to work for installation and later maintenance. The project footage follows that interface from the engineering drawing to the installed panel.

From drawing to site

Solenoid panel / 00:32

From drawing to site

The drawing, assembled panel and installed pipework interfaces.

Open the MP4 directly

Related capability

Panel builds, instrument hook-ups and small-bore tubing can be scoped alongside inspection, test records and handover.

Workshop and modular build

More from HBI